UXO survey along the Perugia–Città di Castello railway line.

Perugia–Città di Castello · 09/2024

UXO survey along the Perugia–Città di Castello railway line.
RFI · original project output
Client
RFI
Industry
Railway, EPC & Infrastructure
Location
Perugia–Città di Castello
Date
09/2024

THE CONTEXT

The project in context.

Non-invasive instrumental survey to a depth of 3 meters below ground level for the detection of anomalies of unexploded ordnance (UXO) along the Perugia-Città di Castello railway section. The investigation covers 19 crossings along a 20 km route, enabling the immediate clearance for subsequent excavation activities.Non-invasive instrumental survey to a depth of 3 meters below ground level for the detection of anomalies of unexploded ordnance (UXO) along the Perugia-Città di Castello railway section. The investigation covers 19 crossings along a 20 km route, enabling the immediate clearance for subsequent excavation activities.

THE CHALLENGE

Understanding the risk.

The specific site conditions, which made the use of ground-penetrating radar impractical due to structural and operational interferences, were overcome through the application of the ERT technique. The intervention, carried out at night to minimize disruptions to railway traffic, ensured accurate results fully aligned with the project requirements.

OUTPUTS

Data ready to use.

Three-dimensional map with characterization of ferromagnetic anomalies and identification of potential UXO-related risks for subsequent targeted clearance if required.

Technical report in compliance with national regulations.

EXECUTIVE SUMMARY

Executive Summary — RFI

Download the complete case study

EXPLORE MORE

Related projects

YOUR NEXT PROJECT

Facing a similar challenge?

Let’s discuss your site, the risk and the outputs you need.

Request a quote