Request a quote
← All case studies

Utilities & Grid / EPC & Infrastructure

Tesla

Utility mapping for Tesla’s EV charging infrastructure.

Centro Commerciale Vulcano, Nola (NA) · 09/2023

Utility mapping for Tesla’s EV charging infrastructure.
Tesla · original project output
Client
Tesla
Industry
Underground Utilities & Networks, EPC & Infrastructure
Location
Centro Commerciale Vulcano, Nola (NA)
Date
09/2023

THE CONTEXT

The project in context.

Mapping of utilities to plan the layout for the installation of ultra-high-power electric cables for electric vehicle charging at the Vulcano Shopping Center in Nola.

THE CHALLENGE

Understanding the risk.

A highly precise mapping was carried out to ensure no interference with existing utilities and to ensure the safe placement of cables.The surveys reduced the need for invasive methods, simplifying the installation process.

OUTPUTS

Data ready to use.

GIS project with 3D geometry of the underground utility layout down to a depth of 7 meters.

dwg file for CAD processing.

EXECUTIVE SUMMARY

Executive Summary — Tesla

Download the complete case study

EXPLORE MORE

Related projects

YOUR NEXT PROJECT

Facing a similar challenge?

Let’s discuss your site, the risk and the outputs you need.

Request a quote